Modular AI Data Centers in West Texas

W Land Development is exploring a connected modular approach to high-density AI infrastructure in West Texas. Our reference concept brings compute rooms, liquid-cooling services and separate power-and-battery wings into a coordinated layout for phased site development.

Reference capacity: 2.5MW compute + 0.2MW support IT = 2.7MW protected IT. This figure excludes cooling, electrical conversion and other site loads. It is a design budget, not an offer of energized capacity.

Rendering 01

Rendering 01 — the complete modular group

V03 concept rendering — computer-generated, not a photograph of an operating facility

Computer-generated V03 concept rendering of a connected 2.5MW compute module. The layout includes 0.2MW of support IT, adjoining CDU rooms, separate A/B power-and-battery wings and outdoor thermal and backup systems. Preliminary and subject to project engineering, equipment selection and permitting.
Computer-generated concept of a connected modular AI data center in West Texas, with a central compute room, attached CDU rooms, separate A/B power-and-battery wings, outdoor cooling and diesel backup.

Computer-generated V03 concept rendering of a connected 2.5MW compute module. The layout includes 0.2MW of support IT, adjoining CDU rooms, separate A/B power-and-battery wings and outdoor thermal and backup systems. Preliminary and subject to project engineering, equipment selection and permitting.

Architecture

Connected rooms, coordinated infrastructure

The central compute room directly adjoins W-A and W-B, the two liquid-cooling service rooms. Separate A and B power wings each combine UPS/electrical equipment and two battery compartments in one custom joined enclosure. Protected interfaces separate wet services, dry electrical systems and the IT environment.

The concept uses connected room assemblies, rather than requiring every function to fit into one standard shipping container. Transformers, heat-rejection equipment, pumps, buffer tanks and backup generation remain outdoors where the project design calls for them.

Reference module

Reference module at a glance

Development status
Proposed reference concept; not an operating or commissioned facility
Compute load
2.5MW across ten conceptual 250kW rack budgets
Support IT
0.2MW for supporting network and storage
Protected IT
2.7MW; mechanical and other site loads are additional
Liquid-cooling services
Four CDUs: two in W-A and two in W-B
Power and batteries
Separate A/B wings; each contains UPS/electrical, BAT16 and BAT20 compartments
Reference equipment
Ten UPS frames and 72 battery cabinets in total
Final qualification
Equipment selection, fit, clearances, fire design and performance require project engineering

Rendering 02

Rendering 02 — how the connected rooms work

V03 concept cutaway — equipment arrangement illustrative, not a final vendor layout

Conceptual cutaway of the V03 connected core. The compute room directly adjoins the two CDU rooms. Each independent electrical wing combines UPS/electrical, BAT16 and BAT20 compartments within one continuous enclosure. Cabinet icons illustrate functions and are not final vendor equipment layouts.
Conceptual cutaway showing ten compute racks, adjoining CDU rooms and an integrated electrical wing divided into UPS, BAT16 and BAT20 compartments.

Conceptual cutaway of the V03 connected core. The compute room directly adjoins the two CDU rooms. Each independent electrical wing combines UPS/electrical, BAT16 and BAT20 compartments within one continuous enclosure. Cabinet icons illustrate functions and are not final vendor equipment layouts.

Each electrical wing retains independent UPS/electrical and battery compartments. The design requires independent compartment air systems, protected service penetrations and exterior maintenance access. Dedicated dry electrical routes remain separate from CDU wet-service spaces.

Four CDUs are shown in total, with two in each cooling service room. The reference power arrangement contains ten UPS frames and 72 battery cabinets across both paths. The concept defines roles and adjacencies; final manufacturer drawings must establish equipment fit, working clearances, removal paths and system performance.

Phased delivery

Repeatable blocks, site-specific delivery

A modular approach can move room fabrication and site preparation into coordinated workstreams. While assemblies are fabricated and tested, site teams can progress grading, pads, utilities and access. This is intended to reduce on-site fit-out and rework; project schedules and costs depend on equipment, permitting, logistics, tenant requirements and commissioning.

W Land's role is to coordinate land development and infrastructure planning with qualified engineering, technology, manufacturing and delivery partners. Larger deployments would need a campus-level model for power, cooling, networking and shared services. The modular reference concept supports that discussion; it does not replace it.

FAQ

Frequently asked questions

Does 2.5MW mean the total electrical supply required?

No. It is the compute-load budget. Supporting network and storage add 0.2MW, giving 2.7MW of protected IT. Cooling, electrical conversion and other site loads need additional source capacity.

Are A and B a shared UPS and battery room?

No. They remain separate power paths. Each joined wing has UPS/electrical and two battery compartments. The final design must establish independent air systems, fire separation and maintenance arrangements.

Can the module be repeated for a larger campus?

It provides a repeatable planning concept. A campus still needs coordinated generation, staged-load, cooling, networking, access and shared-service designs. Module counts alone do not establish total campus capacity.

Are these photographs of an operating data center?

No. Both images are computer-generated concept renderings. Equipment details, clearances and arrangements will change as project engineering develops.

Is this concept Uptime Tier III certified or NVIDIA validated?

No such certification or validation has been established. Any future certification or OEM qualification would require its own formal process.

What information is needed to evaluate a deployment?

A discussion should cover compute and support loads, rack/platform requirements, networking, target energization, cooling conditions, source/fuel strategy, resilience requirements, and site permitting and civil constraints.

Discuss your deployment requirements. Request a project briefing through https://www.wlanddevelopment.com/contact. Bring the intended IT load, platform, cooling and deployment requirements so the team can assess the next engineering steps.